Corporate office building toilet and shower refurbishment

 

Flow Heating Solutions was responsible for full project management here, from demolition through to completion handover. The pictures below show examples of 1 out 16 toilet blocks that were refurbished during this project

 
 
Before 3.JPG

Before

Existing female toilet block

After 3.JPG

After

Post refurbishment female toilet block

 
 
Before 4.JPG

Before

Removal of existing shower enclosure and shower

After 4.JPG

After

Installation of new shower tray, enclosure and electric shower

 
 
Before 5.JPG

Before

Existing Male toilet block

 
After 5.JPG

After

Post refurbishment male toilet block with urinals

 
 
Before 6.JPG

Before

Existing DocM

After 6.JPG

After

Completed DocM toilet refurbishment