Corporate office building toilet and shower refurbishment
Flow Heating Solutions was responsible for full project management here, from demolition through to completion handover. The pictures below show examples of 1 out 16 toilet blocks that were refurbished during this project
Before
Existing female toilet block
After
Post refurbishment female toilet block
Before
Removal of existing shower enclosure and shower
After
Installation of new shower tray, enclosure and electric shower
Before
Existing Male toilet block
After
Post refurbishment male toilet block with urinals
Before
Existing DocM
After
Completed DocM toilet refurbishment